10/2/2023

Attendance: Shihao Mei, Wenhao Lin, Muyang Li, Yuming Jia,

Lenghan Zhu, Keying Zhang


Activities:

1. Drive step motor and servo motor on BreadBoard;

2. Finish all circuit on BreadBoard;

3. Finish the struture of embeded code, completed arrangement of microcontroller pins. FreeRTOS operating system has been deployed.

4. Futher AI model training and coding; Datasets collection for 10000 pictures in total for 7 classes.


5. As the STM32 control board could not be soldered, we decided to reduce the number of flying wires by drawing a carrier board on top of the existing development board, which is only connected by connectors and can be plugged directly on top of the development board. 

If we can receive the 3D printed parts next week, we will send them out to be machined, if not all the materials will be received, the carrier plate production will be abandoned in favour of a fly-by-wire finish using a breadboard.

Carrier board assembly diagram



Problems:

1. PCB is difficult to solid (especially SMD). The copper layer is too close to the component and at the same time there is no solder resist layer on the surface of the PCB, making it impossible to complete the soldering, and only the soldering of the connector can be completed under this processing.

2.The 3D printed parts were not completed and none of the parts were obtained.